Microsoft Project 2010, Managing Projects : 070-178

  • Exam Code: 070-178
  • Exam Name: Microsoft Project 2010, Managing Projects
  • Updated: Aug 14, 2026     Q & A: 70 Questions and Answers

PDF Version Demo
PDF Price: $59.99

PC Test Engine
Software Price: $59.99

Microsoft 070-178 Value Pack (Frequently Bought Together)

070-178 Online Test Engine
  • If you purchase Microsoft 070-178 Value Pack, you will also own the free online test engine.
  • PDF Version + PC Test Engine + Online Test Engine
  • Value Pack Total: $119.98  $79.99
  •   Save 49%

About Microsoft 070-178 Exam

Do you want to get the valid and latest study material for Microsoft Project 2010, Managing Projects actual test? Please stop hunting with aimless. Now, we will offer you the updated Microsoft Project 2010, Managing Projects study practice vce for you. Our Microsoft Project 2010, Managing Projects dumps torrent has been carefully designed to help you easily to pass even the most challenging Microsoft Project 2010, Managing Projects certification and get certified. Microsoft Project 2010, Managing Projects exam prep torrent is valuable and validity, which will give you some reference for the actual test. Our Microsoft Project 2010, Managing Projects dumps torrent has been carefully designed to help you easily to pass even the most challenging Microsoft Project 2010, Managing Projects certification and get certified.

Free Download 070-178 exam dumps pdf

With our Microsoft Project 2010, Managing Projects exam prep torrent, you will just need to spend about 20-30 hours to prepare for the actual test. If your Microsoft Project 2010, Managing Projects actual test is coming soon, I think 070-178 free training material will be your best choice. Microsoft Project 2010, Managing Projects exam prep torrent covers all most the key points in the actual test, so you can review it and master the important knowledge in a short time. Thus, you will never be afraid the Microsoft Project 2010, Managing Projects study practice. An easy pass will be a little case by using 070-178 study dumps.

Our Microsoft Project 2010, Managing Projects study practice allows you to quickly grasp the key points in the actual test. The most important reason that many people choose us is that our Microsoft Project 2010, Managing Projects training material ensure you pass the actual exam 100% in your first attempt. Studying with our Microsoft Project 2010, Managing Projects updated practice torrent will not only save your time and money, but also can boost your confidence to face the difficulties in the actual test. Our Microsoft Project 2010, Managing Projects valid dump provides you the best learning opportunity for real exam. The rapidly increased number of our TS real dumps users is the sign of the authenticity and high quality.

You can free download Microsoft Project 2010, Managing Projects exam demo questions to have a try before you purchase 070-178 complete dumps. Immediately download for Microsoft Project 2010, Managing Projects updated practice is the superiority we provide for you as soon as you purchase. We ensure that our Microsoft Project 2010, Managing Projects practice torrent is the latest and updated which can ensure you pass with high scores. Besides, Our 24/7 customer service will solve your problem, if you have any questions.

After purchase, Instant Download: Upon successful payment, Our systems will automatically send the product you have purchased to your mailbox by email. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)

Microsoft 070-178 Exam Syllabus Topics:

SectionWeightObjectives
Topic 1: Creating a Project Plan20%- Create and organize tasks
  • 1. Set task durations and constraints
    • 2. Enter tasks and milestones
      • 3. Create task hierarchies and WBS
        - Initialize a project
        • 1. Set up project environment and options
          • 2. Define project properties and calendars
            - Create task relationships
            • 1. Link tasks with dependencies
              • 2. Adjust lag and lead times
                Topic 2: Configuring and Automating Projects10%- Work with multiple projects
                • 1. Share resources across projects
                  • 2. Create master/subproject relationships
                    - Customize Project 2010 environment
                    • 1. Use organizer to share elements
                      • 2. Modify toolbars and views
                        Topic 3: Viewing and Reporting Project Data20%- Customize views and tables
                        • 1. Apply filters, groups, and sorts
                          • 2. Modify Gantt Chart, Calendar, and Task Sheet
                            - Create and share reports
                            • 1. Customize and export project information
                              • 2. Use built-in visual reports
                                Topic 4: Managing Resources and Assignments25%- Resolve resource conflicts
                                • 1. Level resources and adjust assignments
                                  • 2. Identify overallocation
                                    - Create and configure resources
                                    • 1. Set resource calendars and availability
                                      • 2. Define work, material, and cost resources
                                        - Assign resources to tasks
                                        • 1. Use Team Planner and Resource Usage views
                                          • 2. Adjust assignment units and work values
                                            Topic 5: Tracking and Controlling Projects25%- Set and save baselines
                                            • 1. Clear or update baselines
                                              • 2. Create baseline plans
                                                - Update progress and schedule
                                                • 1. Record actual work, duration, and costs
                                                  • 2. Reschedule incomplete work
                                                    - Monitor schedule and costs
                                                    • 1. Analyze variance and project performance
                                                      • 2. View critical path and slippage

                                                        Microsoft Project 2010, Managing Projects Sample Questions:

                                                        1. You manage several projects saved on a shared drive. You want to create a critical path relationship between several schedules managed by other project managers. You need to link the project schedules at the task level. You also need to ensure that each project manager can continue to manage their own project. What should you do?

                                                        A) -Open a blank project.
                                                        -Copy and paste each project into the new file.
                                                        -Link tasks as needed.
                                                        -Save the project by using a new name.
                                                        B) -Open a blank project.
                                                        -Insert each project and select the Link to project option.
                                                        -Save the blank project as a new named project.
                                                        -Discard the subprojects.
                                                        C) -Open each individual project.
                                                        -Create date constraints for task deadlines.
                                                        -Save the project.
                                                        D) -Open a blank project.
                                                        -Insert each project and select the Link to project option.
                                                        -Link tasks as needed.
                                                        -Save the subprojects.
                                                        E) -Open a blank project.
                                                        -Insert each project and clear the Link to project option.
                                                        -Save the blank project as a new named project.
                                                        -Discard the subprojects.


                                                        2. You create several new tasks by using the Manually Scheduled Task option. You need to automatically calculate the start and finish dates for linked manually scheduled tasks. You need to achieve this goal while retaining manually scheduled tasks within the project. What should you do?

                                                        A) Modify the values of Scheduled Start and Scheduled Finish.
                                                        B) Use the Respect Links feature.
                                                        C) Highlight the Project Summary task and use the Calculate Project feature.
                                                        D) Insert the task Constraint Type column and change the values for each task to the appropriate values. Then, recalculate the project.


                                                        3. You add a new summary task and detailed tasks to an existing project. You save the changes as Baseline2. You discover that Baseline2 only displays work hours for detailed tasks. You need to ensure that Baselinez displays work hours in the new summary task. What should you do?

                                                        A) ?Highlight the new detailed tasks. ?Click Set Baseline and select Baseline2. ?Click the Selected tasks radio button, and then click OK.
                                                        B) ?Highlight the new summary task. ?Click Set Baseline and select Baseline2. ?Click the Selected tasks radio button, select From Subtasks into selected summary task(s), and then click OK.
                                                        C) ?Highlight the new summary task. ?Click Set Baseline and select Baseline2. ?Click the Entire project radio button, and then click OK.
                                                        D) ?Highlight the new detailed tasks. ?Click Set Baseline and select Baseline2. ?Click the Selected tasks radio button, select From Subtasks into selected summary task(s), and then click OK.


                                                        4. Your project has a part-time resource who works 4 hours a day from Monday through Thursday. You need to ensure that your project plan accommodates the part-time resource. What should you do?

                                                        A) Assign the resource only to tasks that are scheduled on the working days.
                                                        B) Update the base project calendar.
                                                        C) Change the maximum units for the resource.
                                                        D) Change the working time for the resource.


                                                        5. You need to view the following information for your project: ?Current cost ?Baseline cost ?Actual cost ?Remaining cost ?Percentage of completion Which component will display the information?

                                                        A) The default Resource Sheet
                                                        B) The default Task Sheet
                                                        C) The default Cost Table
                                                        D) The Project Statistics window


                                                        Solutions:

                                                        Question # 1
                                                        Answer: D
                                                        Question # 2
                                                        Answer: B
                                                        Question # 3
                                                        Answer: B
                                                        Question # 4
                                                        Answer: D
                                                        Question # 5
                                                        Answer: D

                                                        What Clients Say About Us

                                                        These 070-178 exam questions are valid. I passed today. Some answers were actually different but anyway i succeeded. It is valid and enough to pass.

                                                        Jared Jared       4.5 star  

                                                        I passed the exam 3 days ago. The 070-178 exam Q&As are valid. It is the latest version that i bought.

                                                        Grace Grace       4 star  

                                                        The updated Microsoft Project 2010, Managing Projects answers are correct this time.

                                                        Jonas Jonas       5 star  

                                                        Pass 070-178 exam Successfully.

                                                        Amos Amos       4 star  

                                                        This 070-178 training 070-178 material is what Iam looking for.

                                                        Candance Candance       4.5 star  

                                                        I recommend these 070-178 dumps which are valid and accurate. Also, they seemed the latest as most questions were on the exam.

                                                        Yetta Yetta       4.5 star  

                                                        Passed 070-178, my boss is satisfied with me. Thank you guys!

                                                        King King       4.5 star  

                                                        070-178 exam questions are absolutely great. Trust me for i used them a few days to my 070-178 exam and things went fine. I passed smoothly.

                                                        Duncan Duncan       4 star  

                                                        070-178 real exam questions and answer make 070-178 guide a real success. I passed 070-178 exam with 80% passing and too much happy.

                                                        Maria Maria       4 star  

                                                        And obviously I passed this 070-178 exam.

                                                        Virginia Virginia       4.5 star  

                                                        I just passed the 070-178 exam. There was enough time for me, so i easily completed all 070-178 questions.

                                                        Enid Enid       5 star  

                                                        Valid dumps for the 070-178 exam by PracticeTorrent. I suggest these to everyone. Quite informative and similar to the real exam. Thank you PracticeTorrent.

                                                        Bertha Bertha       4.5 star  

                                                        PracticeTorrent 070-178 real exam questions cover over 91% of the test.

                                                        Isidore Isidore       5 star  

                                                        This is real. I wrote my 070-178 exam today and 95% of the questions were exactly the same on my dump. I passed with a high score.

                                                        Nina Nina       4.5 star  

                                                        I have passed the 070-178 exam recently and confirm that exam questions in file is valid! You can buy it to prapare for the exam!

                                                        Bart Bart       4.5 star  

                                                        One of my colleagues passed the 070-178 exam and surprised everyone in the office. He introduced PracticeTorrent to us, and I passed exam too.

                                                        Martha Martha       4.5 star  

                                                        With your 070-178 exam file, the exam was a piece of cake. Passed with 93% marks!

                                                        Ogden Ogden       4 star  

                                                        Lucky with the help of the 070-178 exam dumps, I studied carefully and passed the exam in one go! Highly recommend!

                                                        James James       4 star  

                                                        LEAVE A REPLY

                                                        Your email address will not be published. Required fields are marked *

                                                        Why Choose Us