NEW QUESTION 30
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The cross-plant status
  • B. The most restrictive status
  • C. The plant-specific status
  • D. The least restrictive status

Answer: B

 

NEW QUESTION 31
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Installation point
  • B. Scrap percentage
  • C. Quantity
  • D. Item type

Answer: A,C

 

NEW QUESTION 32
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

Answer: B

 

NEW QUESTION 33
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Goods receipt processing time
  • C. Queue time
  • D. Float after production
  • E. Move time

Answer: C,D,E

 

NEW QUESTION 34
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Setup time
  • C. Total replenishment lead time
  • D. Float after production

Answer: A,D

 

NEW QUESTION 35
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Change of the storage bin
  • B. Creation of a purchasing contract
  • C. Change of the material'sprocurement type
  • D. Creation of a sales order
  • E. Creation of dependent requirements

Answer: C,D,E

 

NEW QUESTION 36
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Resource network
  • B. Setup matrix
  • C. Work center hierarchy
  • D. Operation network

Answer: C

 

NEW QUESTION 37
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Operation duration
  • C. Total replenishment lead time
  • D. In-house production time

Answer: A,D

 

NEW QUESTION 38
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using finite Scheduling in a planning board.
  • B. You can reschedule the operation using lead the scheduling.
  • C. You can reschedule the order using lead time scheduling.
  • D. You canreschedule the order using material requirements planning.

Answer: A

 

NEW QUESTION 39
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with prioritized alternative work centers
  • C. A production line with more than one work center
  • D. A production line with a parallel sequence in the routing

Answer: C

 

NEW QUESTION 40
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by ATP to determine the priority of alternative components.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by product costing to determine how costs are rolled up.

Answer: B,D

 

NEW QUESTION 41
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Material requirements planning
  • C. Production order release
  • D. Back flushing

Answer: B

 

NEW QUESTION 42
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The lot size range must be within the lot-size range of the assigned routing.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C

 

NEW QUESTION 43
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. Alternative resources are fully occupied.
  • C. The work center has several individual capacities.
  • D. The Change Planning Direct on indicator is set.

Answer: A,C

 

NEW QUESTION 44
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When alternate resourcesare used within one operation
  • C. When multiple production versions are maintained for one product
  • D. When multiple operations are maintained for one product

Answer: B

 

NEW QUESTION 45
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of production costs to the production cost collector
  • B. Archiving of documents for assembly scrap
  • C. Posting of goods receipt for the product
  • D. Reduction of associated capacity requirements
  • E. Material staging for next order in sequence

Answer: A,C,D

 

NEW QUESTION 46
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Red Base
  • C. Top of Yellow
  • D. Top of Green

Answer: D

 

NEW QUESTION 47
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the alert profile to the overall profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the overall profile to the authorization profile.

Answer: B,C,D

 

NEW QUESTION 48
When do you use variant bills of materials (BOMB)?

  • A. When multiplematerial is have similar BOMB
  • B. When a material has multiple BOMB
  • C. When multiple material also have the same BOM
  • D. When a material has a configurable BOM

Answer: C

 